To assess the status and/or implementation degree of a specific implementation a view best of breed methods can be applied like the IMM (Implementation Maturity Method)
Using this method via the following dimensions:
- Process
- Control
- HR
- Means
- Information
For each of the aforementioned areas one can determine the level;
- Initial (lowest level, organisation is not stable
- Repeatable
- Defined
- Managed
- Optimizing